East Bay Roofing Project Gallery
Before and after photos of roof replacements, repairs, tile and metal projects across the East Bay. See the details we build into every roof.
Call (925) 722-4916 for a free estimateThese are completed East Bay jobs, with the city, the month, and what the roof actually needed. Street addresses stay out of the captions, because the homeowner did not agree to be advertised.
Ask for any of them by city and we will send you the street, the permit record, and the dated photo set from tear-off through final walkthrough. Standing in a driveway beats trusting a caption.
Roof Replacements

Concord, May 2026. 1961 ranch, full tear-off
24 squares on a 1961 ranch off Ygnacio Valley Road. Two layers came off to bare sheathing, six sheets of 1/2-inch CDX were replaced where the deck had softened under a valley, then synthetic underlayment and architectural shingle went down. Permit and final inspection through the City of Concord.
Replacement
Walnut Creek, March 2026. Three-tab to architectural
31 squares in Rudgear Estates, moving a 1974 three-tab roof up to a laminated architectural shingle. We brought the ridge vent up to the new mat thickness at the same time, because a 1974 vent is undersized for a heavier shingle and cooks the deck from underneath.
Replacement
Pleasant Hill, February 2026. Insurance storm re-roof
22 squares after the February wind event took ridge caps and lifted field shingles on the west slope. Dated photos and a written scope went to the adjuster before anything moved, and the claim covered the full assembly rather than a patch to the visible damage.
ReplacementTile Roofing

Lafayette, April 2026. Clay tile lift and re-lay
A 1968 clay tile roof where the tile was still sound and the underlayment underneath it was finished. We lifted and stacked the original tile, replaced the membrane and flashing, then re-laid the same tile, so the roof kept its profile and the salvage value stayed in the building.
Tile
Martinez, June 2026. Historic tile, reclaimed match
A downtown Martinez house with a tile profile nobody extrudes anymore. We matched reclaimed tile from two salvage lots and rebuilt both valleys in copper, which is slower and costs more than a membrane overlay, and is the only version that survives the next 40 years.
Tile
Clayton, August 2026. Cracked field tile and ridge caps
Three repairs on one roof: cracked field tile from a fallen limb, four slipped ridge caps, and valley metal that had rusted through. Fixed for a fraction of a re-roof, and the homeowner now has dated photos of what was replaced and why.
TileMetal Roofing

Alamo, July 2026. Standing seam on a fire-zone lot
Standing seam with concealed clips, panels formed to the roof length so there are no end laps, on a property in the wildland fire zone. No exposed fasteners means nothing to back out when the panels heat-cycle in July.
Metal
Danville, September 2026. Stone-coated steel
A shake profile without the shake maintenance, in a Class A assembly built to the whole system rather than the panel alone. Light enough that the 1970s framing did not need reinforcement, which is what made it viable here.
Metal
Brentwood, October 2026. R-panel on a shop
Exposed-fastener R-panel on a 2,400 square foot shop, priced well below standing seam. The tradeoff is honest: every fastener is a future leak point, so we set them with the correct washer and tell the owner to check them after the first hot summer.
MetalRepairs and Emergency Work

Concord, January 2026. Tarp and dry-in after wind
A tarp is a stop-loss, not a repair. We secured this one the same night the ridge opened up, photographed the underside for the claim, and came back inside the week to close the assembly properly.
Repair
Walnut Creek, September 2026. Valley and step flashing
The leak showed up two rooms away from the actual opening, which is normal. The cause was a valley whose metal had been covered over rather than replaced, plus step flashing at a chimney shoulder that had been sealed with caulk for years. Both details were rebuilt in metal.
Repair
Concord, August 2026. Flat roof coating
A 4,800 square foot commercial roof with sound membrane and a chalked, ponding surface. A reflective coating bought another decade at a fraction of a tear-off, and the ponding was traced to a drain strainer rather than the membrane.
RepairBeyond the roof surface
What a documented job file contains
Every job we close gets the same file, and you can ask to see it before you hire us:
- Permit and inspection record. The reroof permit from the city that issues it, plus the inspector's sign-off. See roof replacement for how the permit fits the schedule.
- Dated photos at each stage. Bare deck after tear-off, any sheathing we replaced, underlayment, flashing details at chimneys and valleys, and the finished roof from four sides.
- Flashing close-ups. Step flashing at walls, counterflashing at masonry, pipe boots, and valley metal, because these are where most leaks start. More on that in roof inspection.
- Material documentation. The invoice showing the product and color actually installed, and the manufacturer registration submitted in your name.
- The warranty in writing. Our 10-year workmanship terms, what voids them, and how the coverage transfers if you sell. Details on roofing warranty.
Projects by city
Most of our work sits within twenty minutes of the Concord shop. These city pages cover the housing stock, permit authority, and roof conditions specific to each:
Concord · Walnut Creek · Pleasant Hill · Clayton · Martinez · Lafayette · Alamo · Danville · San Ramon · Pittsburg · Antioch · Brentwood · Oakland · Berkeley · Fremont · Hayward · Livermore · Pleasanton
We work 38 East Bay cities from Vallejo to Livermore. If you want to see a roof like yours, call (925) 722-4916 and ask which of the last few jobs is closest to your street.
Ready to get started? Call the East Bay's trusted roofing contractor.
Get Your Free Roof Inspection
Call today for a no-obligation estimate from a licensed East Bay roofing contractor.
Call (925) 722-4916